News and Announcement
   23rd Foundation Day of Prathamesh was celebrated on 21st March, 2020 on the eve of Gudi Padwa.

Latest Projects


Vetting of Rising Main Designs & Surge Analysis for Narmada-Jhabua Irrigation Project

Vetting of Rising Main Designs & Surge Analysis for Narmada-Jhabua Irrigation Project

Upgradation Of Nanded Kinwat-Mahur-Arni Road Section From Sarsam Budruk To Kothari (Design 57 Km) To Two Lanes With Paved Shoulder Of NH 161 A In The State Of Maharashtra On EPC Mode

Upgradation Of Nanded Kinwat-Mahur-Arni Road Section From Sarsam Budruk To Kothari (Design 57 Km) To Two Lanes With Paved Shoulder Of NH 161 A In The State Of Maharashtra On EPC Mode

Bhandewadi Phase II Project Pipe Line Design Engineering

Bhandewadi Phase II Project Pipe Line Design Engineering

Detail Study And Designing For Revamping Of Existing Raw Water System With Withdrawal Capacity Of 30/40 MLD Water To Be Delivered At Vl Plant From Tel River, Kesinga

Detail Study And Designing For Revamping Of Existing Raw Water System With Withdrawal Capacity Of 30/40 MLD Water To Be Delivered At Vl Plant From Tel River, Kesinga

Planning, Design Of Evaluation & Design Of Existing Nala/ Nala Training Work Within VCPL Boundary And Nala Diversion Work Of Existing Nala For The Vidarbha Cargo Pvt. Ltd. Site At Gumgaon, Tah Hingna,

Planning, Design Of Evaluation & Design Of Existing Nala/ Nala Training Work Within VCPL Boundary And Nala Diversion Work Of Existing Nala For The Vidarbha Cargo Pvt. Ltd. Site At Gumgaon, Tah Hingna,

Fixing Of FGL And Design Of Internal Drainage Of Plot Area Within VCPL Boundary Site At Gumgaon, Tah Hingna, Nagpur

Fixing Of FGL And Design Of Internal Drainage Of Plot Area Within VCPL Boundary Site At Gumgaon, Tah Hingna, Nagpur

Latest News


In Progress

  Execution in progress for  Vishvaraj Environment Pvt. Ltd –Bhandewadi phase II project pipe line design engineering in Nagpur,Maharashtra. Complete Reconnaissance, including acquisition and study of  source data and survey / field investigation data analysis provided. Hydraulic,structural design of pipe line and complete general arrangement & execution drawing provided.

Projects

Examined and re-modelled Hydraulic Design and Surge Analysis of ‘Narmada-Jhabua Irrigation Project’ which was initially designated to IIT-Roorkee by JMC, Mumbai. Value addition in surge equipments with detailed analysis of with/without protection systems based on distinctive experience.