Surge analysis report of As Built data provided by KPTL team for Rising Main 3, 4 and 5– Narmada – Jhabua Irrigation Project. Post author:root Post published:November 10, 2025 Post category: Continue ReadingSurge analysis report of As Built data provided by KPTL team for Rising Main 3, 4 and 5– Narmada – Jhabua Irrigation Project.
Consultancy for preparation of Detailed Project Report (DPR) and Detailed Engineering for 2111 Revenue villages in four district (Amethi, Ambedkar Nagar, Sant Ravidas Nagar & Jaunpur) of UPJJM with Technical support. Post author:root Post published:November 10, 2025 Post category: Continue ReadingConsultancy for preparation of Detailed Project Report (DPR) and Detailed Engineering for 2111 Revenue villages in four district (Amethi, Ambedkar Nagar, Sant Ravidas Nagar & Jaunpur) of UPJJM with Technical support.
Design and Drawings for Intake Well of 23MLD LAHCHURA & KASHIPURA Scheme, Uttar Pradesh. Post author:root Post published:November 10, 2025 Post category: Continue ReadingDesign and Drawings for Intake Well of 23MLD LAHCHURA & KASHIPURA Scheme, Uttar Pradesh.