Water Management System including Design and detailing of Pipeline & Pumping machinary for HZL

  • Construction of 1 million3 Reservoir.
  • Construction of 7500 & 4000 m3 Sump.
  • Design of Pumping Machinary and all appertenances required.
  • Design of Electrical equipments.
  • Design of Centralized SCADA.